A number of projects as we come into September, up in Canada it’s starting to get cold. I need to get rolling with this self-level epoxy countertop project otherwise the cold will affect curing time….
I couldn’t clean the fridge properly due to fiberglass and age, and was worried about mold so I decided to rip the cupboards apart and making more space. A new countertop made with epoxy was installed. Although I ended up tearing this all out over the winter, I don’t have any regrets as I learned how to work with the self-level epoxy countertop mixtures. I also wanted to extend the countertop into the small cubby hole as it was wasted space and I needed more counter space.
I had to check in on the keel repairs I had done, and earlier in the season we had a blue-green algea explosion (cyanobacteria) and I couldn’t see anything at all. Tried again in this video, included some snippets. Nice to see the difference the fresh painted hull vs. the old painted deck. Need to work on that…
After learning about the challenges with propane, it seems that electric cooking is a much better option, and I installed an electric induction cooktop. Trimmed it up with some nice stainless steel.
Also, running water is nice, and decided to install a new tap and water pump that works based on back pressure, so open the tap and the pump starts. Next year, a hot water heater!
Last I did a number of LED light projects due to the power draw. When I was on my extended trip in Lake Ontario I ran the running lights overnight due to a non-functional anchor light and I was slowly loosing my deep cycle battery each night. I had to run my engine to top it up. Changing to LED dropped from 1.2 amps per bulb to .2 amps per LED bulb. This greatly increased the working load of my single deep cycle 100AH battery.